Anastasopoulos, P C, Labi, S, Bhargava, A, Bordat, C and Mannering, F L (2010) Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling Methods. Journal of Construction Engineering and Management, 136(08), 886–93.

  • Type: Journal Article
  • Keywords: Change orders; Highways and roads; Construction; Frequency analysis; Forecasting; Statistics; Indiana; Change orders; Highway construction; Frequency analysis; Forecasting; Statistical models; Indiana;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000198
  • Abstract:
    A common problem at state transportation agencies is the inability to complete projects within the original scope of work. Change orders, which are contractual documents issued to accommodate the additional work in a contract, are generally due to root causes such as design errors, unexpected site conditions, and weather conditions, and intermediate causes such as bidding characteristics. At the preaward phase of project management, an improved understanding of the factors that are associated with change orders will be of value and also can serve as a basis for taking steps to reduce concomitant contractual aberrations such as time delay and cost overruns. Recognizing that the occurrence of change orders is a count variable, this paper analyzes the frequency of change orders using a variety of count-modeling methods including the negative binomial, Poisson, zero-inflated negative binomial, and zero-inflated Poisson. Using 5 years of contract data from Indiana highway projects, appropriate models are estimated to assess the influence of project type, contract type, project duration, and project cost on the frequency of change orders.

El Asmar, M, Lotfallah, W, Whited, G and Hanna, A S (2010) Quantitative Methods for Design-Build Team Selection. Journal of Construction Engineering and Management, 136(08), 904–12.

Ji, S, Park, M and Lee, H (2010) Data Preprocessing–Based Parametric Cost Model for Building Projects: Case Studies of Korean Construction Projects. Journal of Construction Engineering and Management, 136(08), 844–53.

Kent, D C and Becerik-Gerber, B (2010) Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery. Journal of Construction Engineering and Management, 136(08), 815–25.

Kim, B and Reinschmidt, K F (2010) Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method. Journal of Construction Engineering and Management, 136(08), 834–43.

Korkmaz, S, Riley, D and Horman, M (2010) Piloting Evaluation Metrics for Sustainable High-Performance Building Project Delivery. Journal of Construction Engineering and Management, 136(08), 877–85.

Lai, A W Y and Pang, P S M (2010) Measuring Performance for Building Maintenance Providers. Journal of Construction Engineering and Management, 136(08), 864–76.

Mostafavi, A and Karamouz, M (2010) Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis. Journal of Construction Engineering and Management, 136(08), 923–30.

Nguyen, L D and Ibbs, W (2010)  Case Law and Variations in Cumulative Impact Productivity Claims. Journal of Construction Engineering and Management, 136(08), 826–33.

Xu, Y, Chan, A P C and Yeung, J F Y (2010) Developing a Fuzzy Risk Allocation Model for PPP Projects in China. Journal of Construction Engineering and Management, 136(08), 894–903.

Zheng, S and Tiong, R L K (2010) First Public-Private-Partnership Application in Taiwan’s Wastewater Treatment Sector: Case Study of the Nanzih BOT Wastewater Treatment Project. Journal of Construction Engineering and Management, 136(08), 913–22.

Zou, P X W, Chen, Y and Chan, T (2010) Understanding and Improving Your Risk Management Capability: Assessment Model for Construction Organizations. Journal of Construction Engineering and Management, 136(08), 854–63.